LEADING THE BIM TREND – SHAPING THE FUTURE OF THE CONSTRUCTION INDUSTRY

BIM (Building Information Modeling) is an inevitable trend in the global construction industry, including Vietnam. BIM solution brings significant benefits to all stakeholders involved in design and construction, contributing to comprehensive efficiency in safety, quality, schedule, and financial aspects throughout the project lifecycle.

As one of Vietnam’s leading construction contractors, Ricons not only builds high-quality, world-class projects but also provides in-depth consulting solutions on BIM application, optimizing benefits for investors and clients. With the mission of “shaping the future of the construction industry through dedication and responsibility,” Ricons has successfully implemented numerous highly regarded projects, particularly by applying BIM solutions in design, construction, as well as asset operation and management.

Image
Image

BIM SOLUTIONS IN DESIGN AND CONSTRUCTION

Icon

3D CLASH COORDINATION

The 3D visual model is implemented with LOD-300 during the design phase and LOD-400 during construction, enabling quick clash resolution, optimizing solutions, saving time, and minimizing waste.

Icon

3D SHOP DRAWING IMPLEMENTATION

The application of 3D Shop Drawing ensures the highest level of accuracy and efficiency in construction drawings, aligning the understanding among all stakeholders and optimizing the construction process.

Icon

4D CONSTRUCTION METHODOLOGY

4D construction simulation optimizes the construction sequence and schedule management, eliminating major technical and safety risks while ensuring the project's timely completion.

Icon

5D QUANTITY AND COST CONTROL

The application of 5D BIM enables effective quantity and cost control through accurate data modeling, allowing for strict budget management and achieving the highest financial efficiency for the project.

Icon

BIM AS-BUILT MODEL

As one of the pioneering contractors in applying the LOD 500 model according to BIM Forum standards, Ricons ensures accurate "as-built" data, enabling investors to maintain strict control over asset operation and management.

Icon

COMMON DATA ENVIRONMENT (CDE)

We are at the forefront of digital transformation through the application of CDE for cloud-based data management, optimizing document approval processes, saving time and costs, and enhancing project quality.

BIM AWARDS

In 2024, Ricons was honored to receive prestigious awards in BIM application competitions:

✓ Global Award – “Autodesk Design and Make Awards 2024” in the “Outstanding Recognition” category, held in San Diego, USA.
✓ Grand Winner of Southeast Asia and Top in Country – Vietnam at the “Autodesk ASEAN Innovation Awards”, in the “Cloud Advocate of the Year” category.

Previously, Ricons also achieved remarkable milestones in this competition, securing Vietnam’s Top Prize in 2023 and ranking Top 3 in Vietnam in 2022.

Previously, in 2023 and 2022, Ricons had successively won First Prize in Vietnam and Top 3 in Vietnam.

These prestigious accolades stand as a testament to Ricons’ relentless innovation and pioneering efforts in integrating cutting-edge technology into its workflows. The company’s success in these esteemed competitions in 2024 not only reinforces its position in Vietnam and Southeast Asia but also solidifies its presence on the global stage. This recognition serves as a powerful motivation for Ricons to continue leading the way in digital transformation, particularly in BIM and cloud computing solutions, to deliver optimal value to clients and partners.

Global Award – “Autodesk Design and Make Awards 2024” in the “Outstanding Recognition” category

Autodesk ASEAN Innovation Awards 2024

Autodesk ASEAN Innovation Awards 2023

Autodesk ASEAN Innovation Awards 2022

 

THE TEAM IS THE COMPANY’S MOST VALUABLE ASSET

With the culture of “The team is the company’s most valuable asset”, Ricons continuously organizes in-depth training programs to enhance professional skills and keep up with the latest technologies in BIM. As a result, Ricons is always prepared to stay ahead of BIM trends, contributing to improved project quality and the sustainable growth of the company.

 

 

KEY PROJECTS

 

I. BIM PROJECTS IN INDUSTRIAL, INFRASTRUCTURE, AND LOW-RISE CONSTRUCTIONÌý

❖ PACKAGE 5.10 “CONSTRUCTION AND INSTALLATION OF PASSENGER TERMINAL EQUIPMENT AT LONG THANH AIRPORT”

❒ Commencement Year: 2023
❒ Scale: 1 Ground Floor, 3 Upper Floors
❒ Location: Long Thanh District, Dong Nai Province
❒ BIM Applications:

✓ 3D Modeling
✓ Clash Coordination
✓ 4D Construction Methodology
✓ 3D Shop Drawing Implementation
✓ 5D Quantity Management
✓ Operation Management

❉ CDE: Autodesk Coordination, Dalux, Trimble Connect
❉ LOD: 400

❖ÌýTHE CONSTRUCTION PROJECT FOR TERMINAL 3 – TAN SON NHAT INTERNATIONAL AIRPORT PASSENGER TERMINAL

❒ Commencement Year: 2023
❒ Scale: 1 Basement, 4 Above-ground Floors
❒ Location: Tan Son Nhat International Airport, Ho Chi Minh City
❒ BIM Applications:

✓ 3D Modeling
✓ Clash Coordination
✓ Construction Methodology
✓ Shop Drawing Implementation
✓ Quantity Control

❉ CDE: Trimble Connect
❉ LOD: 350~400

❖ DWIGHT SCHOOL HANOI

❒ Commencement Year: 2022
❒ Scale: 1 Basement, 5 Above-ground Floors
❒ Location: Hoang Mai District, Hanoi
❒ BIM Applications:

✓ 3D Modeling
✓ Clash Coordination
✓ 4D Construction Methodology
✓ Shop Drawing Implementation
✓ Quantity Control
✓ Operation Management

❉ CDE: Dalux
❉ LOD: 400

❖ WTC EXPO EXHIBITION CENTER

❒ Commencement Year: 2020
❒ Scale: 3 Exhibition Halls
❒ Location: New City, Binh Duong Province
❒ BIM Applications:

✓ 3D Modeling
✓ Clash Coordination
✓ Construction Methodology
✓ Shop Drawing Implementation
✓ Quantity Control
✓ Operation Management

❉ CDE: Autodesk BIM 360
❉ LOD: 350~400

II. BIM PROJECTS IN HIGH-RISE CONSTRUCTION

❖ ELYSIAN

❒ Commencement Year: 2024
❒ Scale: 1 Basement and 4 Towers with 21 Floors Each
❒ Location: Truong Thanh Ward, Thu Duc City
❒ BIM Applications:

✓ 3D Modeling
✓ Clash Coordination
✓ Construction Methodology
✓ Shop Drawing Implementation
✓ Quantity Control
✓ Operation Management

❉ CDE: Autodesk Build & Trimble Connect
❉ LOD: 350~400

❖ K8HH1

❒ Commencement Year: 2025
❒ Scale: 2 Basements, 1 TowerÌý 20 Floors; 2 TowersÌý 26 Floors,
❒ Location: Tay Ho Urban Area, Hanoi
❒ BIM Applications:

✓ 3D Modeling
✓ Clash Coordination
✓ Construction Methodology
✓ Shop Drawing Implementation
✓ Quantity Control

❉ CDE: Dalux, Trimble Connect
❉ LOD: 350~400

❖ LUMI

❒ Commencement Year: 2024
❒ Scale: 9 Towers ranging from 29 to 35 Floors High
❒ Location: Hanoi
❒ BIM Applications:

✓ 3D Modeling
✓ Clash Coordination
✓ Construction Methodology
✓ Shop Drawing Implementation
✓ Quantity Control

❉ CDE: Trimble Connect
❉ LOD: 350~400

❖ TT AVIO

❒ Commencement Year: 2024
❒ Scale: 2 Basements, 2 Towers with 30 and 37 Floors
❒ Location: Di An City, Binh Duong
❒ BIM Applications:

✓ 3D Modeling
✓ Clash Coordination
✓ Construction Methodology
✓ Shop Drawing Implementation
✓ Quantity Control

❉ CDE: Trimble Connect
❉ LOD: 350~400

❖ CELADON CITY A6.1

❒ Commencement Year: 2022
❒ Scale: 1 Basement, 4 Towers with 14 Floors Each
❒ Location: Tan Phu District, Ho Chi Minh City
❒ BIM Applications:

✓ 3D Modeling
✓ Clash Coordination
✓ Construction Methodology
✓ Shop Drawing Implementation
✓ Quantity Control
✓ Operation Management

❉ CDE: Autodesk Build
❉ LOD: 350~400

❖ CELADON CITY A5B

❒ Commencement Year: 2019
❒ Scale: 1 Basement, 3 Towers with 15 Floors Each
❒ Location: Tan Phu District, Ho Chi Minh City
❒ BIM Applications:

✓ 3D Modeling
✓ Clash Coordination
✓ Construction Methodology
✓ Shop Drawing Implementation
✓ Quantity Control
✓ Operation Management

❉ CDE: Autodesk BIM 360
❉ LOD: 350~400

❖ BECAMEX OFFICE BUILDING & COMMERCIAL COMPLEX

❒ Commencement Year: 2020
❒ Scale: 1 Basement, 1 Tower with 30 Floors
❒ Location: New City, Binh Duong Province
❒ BIM Applications:

✓ 3D Modeling
✓ Clash Coordination
✓ Construction Methodology
✓ Shop Drawing Implementation
✓ Quantity Control
✓ Operation Management

❉ CDE: Autodesk BIM 360
❉ LOD: 350~400

❖ THE NEXUS

❒ Commencement Year: 2021
❒ Scale: 5 Basements, 2 Towers with 35 & 25 Floors
❒ Location: District 1, Ho Chi Minh City
❒ BIM Applications:

✓ 3D Modeling
✓ Clash Coordination
✓ 4D Construction Methodology
✓ Shop Drawing Implementation
✓ Quantity Control
✓ Operation Management

❉ LOD: 350~400