ZhengXing (Vietnam)
N/a
6.8 hectares. Phase II: 2.0 hectares; comprising Workshops C and D with a total floor area of 32,000 m². Along with auxiliary facilities and external roads covering 1,000 m².
Under construction
Thanh Thanh Cong Industrial Park, Trang Bang, Tay Ninh
Design and Construction Phase 2
Phuoc Dong Industrial Park, Gia Loc Ward, Tay Ninh Province
3.5 hectares
Quang Chau Industrial Zone, Bac Giang.
2 factories A01 and A02, each with 5 floors, an area of 69,000m2/factories. LOCATION: Quang Chau Industrial Zone, Bac Giang.
Lot CN4-1, Yen Phong Industrial Park (expansion zone), Thuy Hoa Commune, Tam Da Commune, Yen Phong District, Bac Ninh Province, Vietnam
Area: > 68,000 m2