First Team Vietnam Garment Co., Ltd
Completed
Construction area: 70.000m2
Completed
Bourbon Industrial Park, An Hoa, Trang Bang, Tay Ninh
Structure work of workshop A1 and A2
Phuoc Dong Industrial Park, Gia Loc Ward, Tay Ninh Province
3.5 hectares
Thanh Thanh Cong Industrial Park, Trang Bang, Tay Ninh
6.8 hectares. Phase II: 2.0 hectares; comprising Workshops C and D with a total floor area of 32,000 m². Along with auxiliary facilities and external roads covering 1,000 m².
Long Thanh District, Dong Nai Province
An Area of 376,000 square meters, featuring two separate arrival and departure concourses, consisting of 1 ground floor and 3 upper floors, with a peak roof height of 45.55 meters and provision for 40 parking positions for Code C, E, F aircraft.