Fuyu Precision Technology Co., Ltd
04/2021
Construction area: Workshop F12A: 24.806 m2- Workshop F16: 24.806 m2- Workshop M11: 23.782 m2- Workshop F02,F06,F07: 24.806m2 x 3- Workshop F03,F05: 9931 m2- Workshop F13,F15: 9931 m2
Under construction
Quang Chau Industrial Park, Viet Yen District, Bac Giang Province
Structure work
Phuoc Dong Industrial Park, Gia Loc Ward, Tay Ninh Province
3.5 hectares
Thanh Thanh Cong Industrial Park, Trang Bang, Tay Ninh
6.8 hectares. Phase II: 2.0 hectares; comprising Workshops C and D with a total floor area of 32,000 m². Along with auxiliary facilities and external roads covering 1,000 m².
Nguyen Huu Tri Street, Thanh Phu, Ben Luc, Long An, Vietnam
22 ha