每日大赛官网

每日大赛官网 COMMENCES BLANCA CITY PROJECT IN VUNG TAU CITY

12/03/2026

On the morning of March 12, 2026, Ricons, together with Newtecons and SOL E&C, officially commenced The 3/2 Boulevard Urban Area Project located in Ward 10 and Ward 11, Vung Tau City (commercial name: Blanca City) under the package for structural construction and rough finishing of the high-rise buildings OCC1, OCC2, DV2.1, DV2.2, DV2.3 and DV2.4.

Blanca City project is developed by Sun Group and is located in the central area of Ward 10 and Ward 11, Vung Tau City. The project boasts a prime location with two frontages: one along 3/2 Boulevard, the city鈥檚 main arterial route, and the other facing Bai Sau Beach, the most beautiful and vibrant beach in Vung Tau. Spanning 96.6 hectares, the project is expected to become one of the largest model urban developments in Vung Tau, Ho Chi Minh City, and the Southern region.

Project Perspective Picture_Blanca City

Blanca City is planned as a model coastal 鈥渁ll-in-one鈥 urban development, integrating three pillars: living 鈥 resort 鈥 entertainment. Residents will enjoy a comprehensive ecosystem of amenities, including the largest beachfront shopping mall in Vietnam, a chain of high-end hotels, and a nearly one-kilometer private beach, a feature appearing in Vung Tau for the first time.

Within this project, Ricons has been entrusted by the developer to construct two towers under the 鈥淥CC2 High-Rise Residential Package鈥 (Tower 5 and Tower 6). The two towers will have 36 and 40 floors respectively, with three basement levels, providing 1,100 residential units. Ricons will carry out the structural construction and rough finishing works for Towers 5 and 6.

With the capability of a leading construction general contractor in Vietnam and more than 20 years of development, Ricons will mobilize the resources to ensure Safety 鈥 Quality 鈥 Schedule, meeting its commitments to the developer and contributing to the creation of a new coastal urban landmark in Vung Tau City.

OTHER NEWS

thumb

每日大赛官网 UPDATES PROGRESS OF SUN FELIZA SUITES PROJECT: SUCCESSFULLY COMPLETING THE CONCRETE POURING OF 5 PIT FOUNDATION CAPS WITH A TOTAL VOLUME OF 7,800 m鲁

19/03/2026

Over five consecutive days and nights, from March 14 to 18, 2026, Ricons, in collaboration with SOL E&C, successfully completed...

thumb

每日大赛官网 COMMENCES CONSTRUCTION OF BROTEX (VIETNAM) COLORED YARN FACTORY 鈥 PHASE 4

18/03/2026

On March 18, 2026, Ricons officially commenced construction of the Brotex (Vietnam) Colored Yarn Manufacturing Plant 鈥 Phase 4...

thumb

每日大赛官网 UPDATES CONSTRUCTION PROGRESS OF THE ELYSIAN PROJECT | MARCH 2026

16/03/2026

As of March 2026, Elysian project , developed by Gamuda Land , is being actively carried out by...